Site start
Site start — Inis
Inis, Clare
1 commencement notice · start date 03 Feb 2020 · planning reference given
Planning P19/188
- Commencement notices
- 1
- Latest start date
- 03 Feb 2020
- Latest notice
- 216 m²
- Planning reference
- P19/188
- Location
- Inis, Clare
Location
Where the site is
- Area
- Inis, Clare
- County
- Clare
Addresses on the notices
- Ennis Railway Station
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Removal of an Existing temporary steel footbridge, modifications to the existing Platforms and fences & Construction of a new accessible passenger footbridge, with 2 no. stairs and 2 no. lifts, between the existing platforms at Ennis Railway Station.
Floor area stated for this source: 216 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.