Site start
Site start — Leopardstown
Leopardstown, Dublin
1 commencement notice · start date 27 Apr 2015 · planning reference given
Planning D08A/0763/E · Planning application
- Commencement notices
- 1
- Latest start date
- 27 Apr 2015
- Latest notice
- Scale not stated
- Planning reference
- D08A/0763/E
- Location
- Leopardstown, Dublin
Location
Where the site is
- Area
- Leopardstown, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1 No. block (known as Block H) of 8 storeys over three basement levels providing for 396 no. car parking spaces and with a gross floor area of 13,705 sq.m. This block is provided as a replacement for a Block H (15,015sq.m) granted planning permission under Register Ref. D98A/0886 and is of a similar overall height and layout.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.