Site start
Housing site start — Dublin
Dublin 4, Dublin
1 commencement notice · start date 17 Dec 2019 · planning reference given
Planning WEB1365/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 17 Dec 2019
- Latest notice
- 1 house
- Planning reference
- WEB1365/19
- Location
- Dublin 4, Dublin
Location
Where the site is
- Area
- Dublin 4, Dublin
- County
- Dublin
Addresses on the notices
- the rear at 19 Sandford Avenue, Donnybrook, Dublin 4
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: Alterations to the front elevation, comprising the removal of the existing porch roof structure; Alterations to the rear elevation, comprising the insertion of a single bathroom window to the first floor facade, facing east; Construction of a single storey extension (measuring 80.5m2) to the rear of the existing dwelling, with glazed, sliding doors to the rear garden; Construction of a metal brise soleil structure to the rear of the proposed new extension; Provision of a glazed sliding rooflight to the new extension at the rear at 19 Sandford Avenue, Donnybrook, Dublin 4.
Floor area stated for this source: 80 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.