Commencement notice group
Housing commencement notices — BALLYFAD
BALLYFAD, Wexford
1 unique commencement event · latest notified commencement 28 Aug 2024 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 28 Aug 2024
- Latest notice
- 1 house
- Planning references supplied
- 20231268
- Public location
- BALLYFAD, Wexford
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 20231268 Wexford County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- BALLYFAD, Wexford
- County
- Wexford
Notice location variants
- Glebe House, a protected structure
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wexford County Council planning record Application details, status and decision record for 20231268. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development at Glebe House, a protected structure. The proposals involve the renovation of the main house along with the addition of single storey extensions (totaling 39 sq. m) renovation and change of use of the outbuildings from agricultural to residential use ancillary to the main house, and the provision of new on site waste and surface water treatment systems. The works will include the following: Replacement of the existing roofs to include new rooflights (retaining natural slate where feasible). Repairs to existing windows in the main house with like for like replacement where required. The installation of new windows and doors to the existing opes in the outbuildings. Alteration to existing openings to accomodate new doors and windows. Repair and selected replacement of external render. The provision of roof mounted photvoltaic panels. Internal alterations including new stud partitions to create additional bathrooms, the installation of new insulated floor slabs and breathable insulation systems, the provision of new service installations throughout, the making good to existing fabric and finishes, the widening of the entrance gates, sundry garden and landscaping works
Floor area stated for this source: 966 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.