Commencement notices — Naas

Naas, Kildare

1 separate notice · latest notified commencement 25 Nov 2019 · planning reference supplied

Source notices
1
Latest notified commencement
25 Nov 2019
Latest notice
10,405 m²
Planning references supplied
16/434
Public location
Naas, Kildare

Public source geography

Site location

Public site / locality
Naas, Kildare
County
Kildare
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference16/434

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0059352KE BCMS open-data feed

The development will consists of the construction of a new right hand turning lane, new bus set down area and revised line of footpath, cycle lane and timber post and rail boundary fence on the access road off the Western Distributor road- all works outside the site boundary, entrance gates, removal of derelict prefabricated structures and culvert of ditch within the site and the construction of a 10,450 sq. m two and three storey 1000 pupil post-primary school including general teaching and administration rooms, a PE Hall, a Special Needs Unit, external stores, ESB substation, 118 car park spaces, 250 cycle parking spaces, bus and car set down and pick up facilities, 3no. hard play areas, 1no. all-weather pitch, grass play areas, new timber post and rail boundary fence to S-W boundary, hard and soft landscaping and associated development works.

10,405 m² · stated on this notice

Planning reference 16/434

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.