Commencement notice group

Housing commencement notices — Court Road

Court Road, Limerick

2 separate notices · latest notified commencement 08 Apr 2024 · planning references supplied

Source notices
2
Latest notified commencement
08 Apr 2024
Latest notice
34 m²
Planning references supplied
14/1227 · 19/7018
Public location
Court Road, Limerick

Public source geography

Site location

Public site / locality
Court Road, Limerick
County
Limerick
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference14/1227
Planning reference19/7018

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0112139LL BCMS owner-supplied export

Proposed Detached Garage

34 m² · stated on this notice

Planning reference 14/1227 Planning reference 19/7018 Builder stated: Peter Healy Ltd
CN0112174LL BCMS owner-supplied export

Proposed Two Storey Dwelling House, Entrance gates, onsite treatment system and associated site works

1 home · 306 m² · stated on this notice

Planning reference 14/1227 Planning reference 19/7018 Builder stated: Peter Healy Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.