Site start
Housing site start — Sandymount
Sandymount, Dublin
1 commencement notice · start date 06 Apr 2016 · planning reference given
Planning 3298/11
- Commencement notices
- 1
- Latest start date
- 06 Apr 2016
- Latest notice
- Scale not stated
- Planning reference
- 3298/11
- Location
- Sandymount, Dublin
Location
Where the site is
- Area
- Sandymount, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Opt-Out - Demolition of existing non-original single storey extension to rear, alteration to window/door opes to ground floor, two new window opes to first floor, the relocation of door opes & partitions internally, the construction of a single storey extension (70sqm) & a first floor extension with dormer window to rear return (28sqm), replacement of PVC windows with timber sash to existing house, provision of new services, repairs & reinstatement of cornices to principal rooms, redecoration, removal of sand/cement render to original return, localised repointing & brickwork repairs to elevations, re- instatement of vehicular gates similar to original, installation of solar panels & associated site works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.