Site start
Housing site start — Brannockstown
Brannockstown, Kilcullen, Kildare
1 commencement notice · start date 15 Aug 2018 · planning reference given
Planning 16788 · Council file · external
- Commencement notices
- 1
- Latest start date
- 15 Aug 2018
- Latest notice
- 7 houses
- Planning reference
- 16788
- Location
- Brannockstown, Kilcullen, Kildare
Location
Where the site is
- Area
- Brannockstown, Kilcullen, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
7 No. detached dwellings consisting of: (a) 4 No. four bedroom, storey and a half dwelling houses with detached garages; (b) 3 No. four bedroom, dormer dwelling houses with detached garages; (c) All dwellings with individual onsite waste water treatment systems and associated percolation areas; (d) New site entrance along with all associated site development and facilitating works. Revised by Significant Further Information which consists of the proposed development now comprises for a new school drop off / set down area / pedestrian access point to the school and the development boundary has been altered
Floor area stated for this source: 1,731 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.