Site start
Housing site start — Raheny
Raheny, Dublin
1 commencement notice · start date 01 Aug 2024 · planning reference given
Planning 3016/24 · Planning application
- Commencement notices
- 1
- Latest start date
- 01 Aug 2024
- Latest notice
- 34 m²
- Planning reference
- 3016/24
- Location
- Raheny, Dublin
Location
Where the site is
- Area
- Raheny, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
New first floor extension with pitched roof to the side of the existing house over the existing ground floor garage and utility room. The conversion of the attic space over the new first floor extension for use as a study, with a new dormer roof to the rear of new/ existing roof. The installation of 3 number velux roof lights to the front plane of the new/existing roof. Plus all associated site works.
Floor area stated for this source: 34 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.