Commencement notice group

Housing commencement notices — Malahide

Malahide, Co. Dublin, Dublin

4 unique commencement events · latest notified commencement 28 Sep 2021 · planning references supplied

View full project timeline

Unique commencement events
4
Latest notified commencement
28 Sep 2021
Latest notice
11,725 m²
Planning references supplied
SHD/013/19 · ABP-305991-19
Public location
Malahide, Co. Dublin, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Malahide, Co. Dublin, Dublin
County
Dublin

Notice location variants

  • Malahide, Dublin CN0070291FL, CN0068534FL, CN0064273FL
  • Seamount Road, Seamount Abbey, Malahide, Co CN0068534FL, CN0064273FL
Location evidence needs care
  • Notice source points are up to 322 m apart, so no combined representative point is shown.

Source positions remain separate:

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-305991-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0081777FL BCMS owner-supplied export

Blocks of 76 no. apartments above shared basement with associated site works. Phase 3 of SHD/013/19

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 11,725 m².

Source unit value with scope not stated: 76 units. It is not presented as notice-specific scale.

Planning reference SHD/013/19 Appeal reference ABP-305991-19 Builder stated: Ballymore Ireland Contracting Services Ltd Developer stated: Ballymore Property Developments Ltd
CN0070291FL BCMS open-data feed

40 no. dwellings and the retaining wall with associated site works. Phase 2 of SHD/013/19.

Work stated for this notice 40 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 5,760 m².

Planning reference SHD/013/19 Appeal reference ABP-305991-19
CN0068534FL BCMS owner-supplied export

Development of 7 no. dwellings - Phase 1 of the development under SHD/013/19 Planning Permission Grant ABP-305991-19 for development of 142 residential units (58 no. houses, 76 no. apartments, 8 no. maisonette apartments), childcare facility and associated site works at Seamount Road, Seamount Abbey, Malahide, Co. Dublin. Phase 1 Development of 7 no. dwellings involves 4 no. two storey 3 bed terraced houses type D, 2 no. two storey 4 bed semi- detached houses type A and 1 no. 2 storey 4 bed detached house type C.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 935 m².

Source unit value with scope not stated: 142 units. It is not presented as notice-specific scale.

Planning reference SHD/013/19 Appeal reference ABP-305991-19 Builder stated: Ballymore Station Walk Ltd Developer stated: Ballymore Property Developments Ltd
CN0064273FL BCMS open-data feed

Enabling works consisting of construction of Haul Road, Site Compound, Foul Drainage line, Storm Drainage line, Movement of existing mounds of subsoil on site, Earthworks for roads, Security lighting and Watermain diversion pipes. These works are in relation to the development under Planning Permission Grant ABP-305991-19 for development of 142 residential units (58 no. houses, 76 no. apartments, 8 no. maisonette apartments), childcare facility and associated site works at Seamount Road, Seamount Abbey, Malahide, Co. Dublin. Building works (142 units, childcare facility) will be a subject of a separate Commencement Notice with documentation (Long Form).

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 120 m².

Planning reference SHD/013/19 Appeal reference ABP-305991-19

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.