Commencement notice group

Housing commencement notices — Tuam

Tuam, Galway

2 separate notices · latest notified commencement 26 Sep 2025 · planning reference supplied

Source notices
2
Latest notified commencement
26 Sep 2025
Latest notice
60 m²
Planning references supplied
24/61735
Public location
Tuam, Galway

Public source geography

Site location

Public site / locality
Tuam, Galway
County
Galway
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference24/61735

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0133686GC BCMS owner-supplied export

CONSTRUCTION OF NEW GARAGE/FUEL STORE INCL. ALL ASSOCIATED SITE DEVELOPMENT WORKS.

60 m² · stated on this notice

Planning reference 24/61735
CN0133685GC BCMS owner-supplied export

CONSTRUCTION OF NEW DWELLING HOUSE, EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA INCL. ALL ASSOCIATED SITE DEVELOPMENT WORKS.

1 home · 217 m² · stated on this notice

Planning reference 24/61735

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.