Site start
Building extension site start — Dublin
Dublin 11, Dublin
1 commencement notice · start date 16 Nov 2026 · planning reference given
Planning FW26A/0203E · Planning application
- Commencement notices
- 1
- Latest start date
- 16 Nov 2026
- Latest notice
- 1 unit
- Planning reference
- FW26A/0203E
- Location
- Dublin 11, Dublin
Location
Where the site is
- Area
- Dublin 11, Dublin
- County
- Dublin
Addresses on the notices
- first-floor level and 1 no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a new single-storey side and rear extension (31.6 sqm GIA) with rooflights and access doors to the side passage and the rear garden; removal of second-floor balcony door and installation of new window on front facade; installation of 2 no. new obscured windows in the side gable (1 no. window at first-floor level and 1 no. window at second-floor level); internal and external alterations, including the installation of a green roof on the first-floor flat roof/ floor of second level balcony; and all associated site works.
Floor area stated for this source: 32 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.