Site start
Housing site start — Dublin
Dublin 3, Dublin
2 commencement notices · latest start date 05 Apr 2019 · planning reference given
Planning 3727/17
- Commencement notices
- 2
- Latest start date
- 05 Apr 2019
- Latest notice
- 1 house
- Planning reference
- 3727/17
- Location
- Dublin 3, Dublin
Location
Where the site is
- Area
- Dublin 3, Dublin
- County
- Dublin
Addresses on the notices
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 2 Storey dwelling and associated site works at 42 North Strand Road, Dublin 3, Dublin.
Floor area stated for this source: 80 m².
7-Day Notice - the demolition of existing 1st floor and rear extensions; the construction of a 1st & 2nd floor above the existing building to form a three storey building to accommodate 2 no. 1 bedroom apartments; the construction of an adjoining two storey town house at the rear, fronting onto Clinches Court, and the change of use of existing ground floor unit and associated basement to a general commercial unit
Floor area stated for this source: 215 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.