Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 04 Sep 2019 · planning reference given
Planning 2991/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 04 Sep 2019
- Latest notice
- 1 house
- Planning reference
- 2991/19
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- ground floor to face new courtyard and modification to existing door ope to rear living room to provide new window
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. Alterations to the existing single storey extension to the rear which will include: a) Partial demolition of existing single storey extension to provide for a new external courtyard to rear of existing house, b) Proposed single storey flat roof extension to the rear, c) Proposed new flat roof with parapet and associated rooflight to replace the pitched roof to the existing extension, d) Modification to rear elevation of existing extension, e) Interior alterations, boundary wall treatments and associated site development works. 2. Proposed new external wall with 2 no. windows to side rear at ground floor to face new courtyard and modification to existing door ope to rear living room to provide new window. 3. Internal alterations to existing house.
Floor area stated for this source: 222 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.