Site start
Housing site start — Portmarnock
Portmarnock, Dublin
1 commencement notice · start date 24 Oct 2022 · planning reference given
Planning F22A/0244 · Planning application
- Commencement notices
- 1
- Latest start date
- 24 Oct 2022
- Latest notice
- Scale not stated
- Planning reference
- F22A/0244
- Location
- Portmarnock, Dublin
Location
Where the site is
- Area
- Portmarnock, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extension, alterations and renovation of an existing dwelling house & shed consisting of: (i) an extension to living accommodation of approx. 70.7 sq.m, (ii) an extension to the existing shed, to provide ancillary games/lounge/store use of approx. 48.7 sq.m, (iii) alterations to the existing elevations & fenestration of dwelling, (iv) minor realignment of existing roadside boundary to facilitate improved sightlines from existing vehicular entrance along with revised roadside boundary treatment (v) the decommission of an existing septic tank & treatment area, (vi) the installation of a new on-site treatment unit & polishing filter, (vii) along with all associated site works to facilitate the development - Opt Out
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.