Site start

Housing site start — Dublin

Dublin 1, Dublin

1 commencement notice · start date 27 Mar 2023 · planning reference given

Planning 4500/22 · Planning application

View full project timeline

Commencement notices
1
Latest start date
27 Mar 2023
Latest notice
3 units
Planning reference
4500/22
Location
Dublin 1, Dublin

Location

Where the site is

Area
Dublin 1, Dublin
County
Dublin

Addresses on the notices

  • basement and ground floor level and to residential at first, second and third floor levels to accommodate 3 no
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

‘The development will consist of: - Change of use from public house to retail at basement and ground floor level and to residential at first, second and third floor levels to accommodate 3 no. 1-bed apartments. - Associated internal alterations; - Alterations to elevations to include re-instatement of original window configuration at upper floor levels and revised shopfront at street level; - Bin store and all associated site works and services.

Work stated for this notice 3 units Explicit phase quantity stated by the source.

Floor area stated for this source: 217 m².

Planning reference 4500/22

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.