Site start
Housing site start — Blackrock
Blackrock, Dublin
2 commencement notices · latest start date 30 May 2022 · planning reference given
Planning D21A/1004 · Planning application
- Commencement notices
- 2
- Latest start date
- 30 May 2022
- Latest notice
- 180 m²
- Planning reference
- D21A/1004
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
Addresses on the notices
- the rear of the garden, The widening of the existing vehicular entrance
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Plot 'B' -the construction of a two-storey dormer house· (150 sqm) on Plot 'B'. A home office/shed of 30 sqm at the rear of the garden, The widening of the existing vehicular entrance. (4) Any ancillary contingent siteworks.
Floor area stated for this source: 180 m².
Plot 'A' -to include the demolition of the existing 21 sqm flat roof extension at the rear, the construction of 27 sqm single storey extension and a 78 sqm two-storey extension to the rear, alterations and renovations to existing dwelling house of 80 sqm to give total gross floor area of 170 sqm. A new (3 sqm) entrance porch to the front facade and a home office/shed of 30 sqm at the rear of the garden. The formation of a new vehicular access from the road. Any ancillary contingent siteworks.
Floor area stated for this source: 161 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.