Site start
Commercial site start — Terenure
Terenure, Dublin
1 commencement notice · start date 13 Jun 2019 · planning references given
Planning ABP-300345-17 & 2972/17
- Commencement notices
- 1
- Latest start date
- 13 Jun 2019
- Latest notice
- 64 m²
- Planning references
- 2972/17 · ABP-300345-17
- Location
- Terenure, Dublin
Location
Where the site is
- Area
- Terenure, Dublin
- County
- Dublin
Addresses on the notices
- Greenlea Road, Terenure, Dublin 6W
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-300345-17. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
7-Day Notice - The development will consist of the construction of a dormer type studio/workshop (non commercial) for leisure only, the provision of 1 carpark space along with all associated site works at Greenlea Road, Terenure, Dublin 6W
Floor area stated for this source: 64 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.