Site start
Housing site start — Ballsbridge
Ballsbridge, Dublin
1 commencement notice · start date 28 May 2025 · planning reference given
Planning 4314/24 · Planning application
- Commencement notices
- 1
- Latest start date
- 28 May 2025
- Latest notice
- 273 m²
- Planning reference
- 4314/24
- Location
- Ballsbridge, Dublin
Location
Where the site is
- Area
- Ballsbridge, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
removal of render to existing gable wall (to main house volume), repairs to wall, and new render application in NHL2 lime with cementitious plinth. Works will include replacement of PVC hopper head with cast iron, repairs to existing cast iron rainwater pipe and installation of a french drain to the base of the wall.
Floor area stated for this source: 273 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.