Commencement notice group

Building extension commencement notices — Newbridge

Newbridge, Kildare

2 unique commencement events · latest notified commencement 16 Dec 2025 · planning reference supplied

Unique commencement events
2
Latest notified commencement
16 Dec 2025
Latest notice
1,563 m²
Planning references supplied
ABP-316491
Public location
Newbridge, Kildare

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Newbridge, Kildare
County
Kildare

Notice location variants

  • the previously approved brewery facility IDA, Newbridge, Co
Location evidence needs care
  • Notice source points are up to 407 m apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 53.188946, -6.771555 Open point
  • Public notice source · 53.189031, -6.765454 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-316491. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Proposed extension to Main Brewery Facility (c. 1,563m2) at the previously approved brewery facility IDA, Newbridge, Co.Kildare. This development will consist of previously planned processing plant with associated areas such as driver room, two storey plant space, electrical plant, storage facilities, extension to process area located above process centrifuge etc.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,563 m².

Appeal reference ABP-316491
Notice 2 Commencement notice

Purpose-built brewery facility to include: Main Brewery Facility Building, Utility Building, Waste Storage building, ESB Substation and customer switch room building, Security Guardhouse, Pumproom & all associated site development works and associated ancillary works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 9,630 m².

Appeal reference ABP-316491

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.