Site start
Site start — Shannon Airport
Shannon Airport, Clare
1 commencement notice · start date 05 Sep 2018 · planning reference given
Planning P16/788
- Commencement notices
- 1
- Latest start date
- 05 Sep 2018
- Latest notice
- 24 m²
- Planning reference
- P16/788
- Location
- Shannon Airport, Clare
Location
Where the site is
- Area
- Shannon Airport, Clare
- County
- Clare
Addresses on the notices
- Shannon Airport, Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development of Phase 2 of the Fire Training Ground at Shannon Airport, Co. Clare. Works to consist of the installation of a Pump Sump, Electrical Control Shed, Simulator Control Shed, Site Lighting in addition to process pumps and all associated pipe work, valves and fittings, main service installations including water, drainage and power supply.
Floor area stated for this source: 24 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.