Site start
Housing site start — Dublin
Dublin 7, Dublin
1 commencement notice · start date 07 Jun 2021 · planning references given
Planning ABP306991-20 SHD0002/18
- Commencement notices
- 1
- Latest start date
- 07 Jun 2021
- Latest notice
- 1 unit
- Planning references
- SHD0002/18 · ABP-306991-20
- Location
- Dublin 7, Dublin
Location
Where the site is
- Area
- Dublin 7, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-306991-20. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Office accommodation is proposed above the substation and refuse store which will be accessed by an external stair on the north elevation. This residential accommodation will comprise of open plan office space, a meeting room and WC with the occupancy being less that 50 and travel distances within 18m in a single direction after fit-out. There is also a shed for storage proposed under the external stair accessed directly from the external.
Floor area stated for this source: 73 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.