Site start
3,200 m² building, Dublin 2
Dublin 2, Dublin
1 commencement notice · start date 02 May 2023 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 02 May 2023
- Latest notice
- 3,200 m²
- Planning references
- None given
- Location
- Dublin 2, Dublin
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The project consists of the fitout of ground, first and second floor existing CAT A Floors along with alterations to existing third and fourth floor CAT B fitout to Block 2, Miesian Plaza, Baggot Street Dublin 2 for Takeda Dublin. Works will include the installation of partitions, bespoke joinery, glazed screens and the associated M&E works.
Floor area stated for this source: 3,200 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.