Site start

Housing site start — Glasnevin

Glasnevin, Dublin

1 commencement notice · start date 12 May 2016 · planning reference given

Planning 2934/15

Commencement notices
1
Latest start date
12 May 2016
Latest notice
1 house
Planning reference
2934/15
Location
Glasnevin, Dublin

Location

Where the site is

Area
Glasnevin, Dublin
County
Dublin

Addresses on the notices

  • ground floor level and c
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Opt Out - The construction of an extension of c.103sqm (c.68sqm at ground floor level and c.35sqm at first floor level) to the front, side and rear of an existing two storey detached house (c.170sqm) including the conversion of an existing single storey garage (c.18.5sqm) to the front, the construction of a single storey shed (c.2.3sqm) to the side and the demolition of an existing single storey structure (c.35sqm) to the rear.

Work stated for this notice 1 house Explicit phase quantity stated by the source.
Planning reference 2934/15

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.