Commencement notice group

Building extension commencement notices — INVER

INVER, Donegal

2 unique commencement events · latest notified commencement 12 Sep 2018 · planning reference supplied

Unique commencement events
2
Latest notified commencement
12 Sep 2018
Latest notice
51 m²
Planning references supplied
15/50397
Public location
INVER, Donegal

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
INVER, Donegal
County
Donegal

Notice location variants

  • ESB Binbane 110 kV Substation, Townland of Meenacahan, Inver, Co SN0002654DL
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0003513DL BCMS open-data feed

Development consists of an extension to the existing 110 kV Substation compound with new electrical equipment and associated bases. Together with this extension, the development consists of a new 38 kV GIS module. This module is founded on a 2 m deep cable basement of which 1 m is underground. The cable pit, foundations and supporting columns are reinforced concrete structures. Drainage from the cable pit and from the module roof is to be installed also.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 51 m².

Planning reference 15/50397
SN0002654DL BCMS open-data feed

Single storey extension to the Control Building at ESB Binbane 110 kV Substation, Townland of Meenacahan, Inver, Co. Donegal.

Work stated for this notice Scale not stated for this notice.
Planning reference 15/50397

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.