Site start
Building extension site start — Finglas East
Finglas East, Dublin
1 commencement notice · start date 01 Jun 2026 · planning reference given
Planning WEB6095/25 · Planning application
- Commencement notices
- 1
- Latest start date
- 01 Jun 2026
- Latest notice
- 31 m²
- Planning reference
- WEB6095/25
- Location
- Finglas East, Dublin
Location
Where the site is
- Area
- Finglas East, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Ground floor garage conversion to habitable accommodation with a frontfacing window; replacement of the existing garage roof with a flat roof incorporating two rooflights; single- storey flat-roof extension to the front and side; and infill of the front porch. Widening of existing front vehicular access.
Floor area stated for this source: 31 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.