Site start
Blessington Industrial Estate — site start
Blessington, Wicklow
1 commencement notice · start date 15 Jul 2016 · planning reference given
Planning 15838 · Council file · external
- Commencement notices
- 1
- Latest start date
- 15 Jul 2016
- Latest notice
- Scale not stated
- Planning reference
- 15838
- Location
- Blessington, Wicklow
Location
Where the site is
- Area
- Blessington, Wicklow
- County
- Wicklow
Addresses on the notices
- Blessington Industrial Estate, Burgage More, Blessington Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. A change of use of existing industrial unit to a funeral home and joinery workshop. 2. Modifications to all external elevations. 3. The construction of a porch area to the front elevation. 4. Lowering of part of existing boundary wall and the erection of rails to the perimeter along with an increase in parking area 5. Decommissioning of existing septic tank and percolation area and a new connection to the existing main foul sewer line and all associated site works at Blessington Industrial Estate, Burgage More, Blessington Co. Wicklow
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.