Site start
Building extension site start — Naas
Naas, Kildare
2 commencement notices · latest start date 20 Nov 2019 · planning reference given
Planning 17.1007
- Commencement notices
- 2
- Latest start date
- 20 Nov 2019
- Latest notice
- Scale not stated
- Planning reference
- 17.1007
- Location
- Naas, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 17.1007 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Naas, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 17.1007. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Two storey extension and single storey extension to rear (north west); internal alterations including new staircase; repairs and maintenance works to existing front facade; new granite front steps to replace existing steps and railings.
Two storey extension and single storey extension to rear (North West), internal alterations including new centre staircase; repairs and maintenance works to existing front façade; new granite front steps to replace existing steps and railings to existing front entrance; replacement of existing PVC windows with new double glazed painted timber windows; roof works to existing roof; replacement of existing roof lights with new, no. 2 roof lights in new roof to north east, new raised external patio area to north east, sundry minor alteration works; decommissioning of existing septic tank and replacement with new tank and percolation area and all associated site works to an existing two storey detached house which is a protected structure
Floor area stated for this source: 696 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.