Building extension commencement notices — Naas

Naas, Kildare

2 separate notices · latest notified commencement 20 Nov 2019 · planning reference supplied

Source notices
2
Latest notified commencement
20 Nov 2019
Latest notice
1 unit
Planning references supplied
17.1007
Public location
Naas, Kildare

Public source geography

Site location

Public site / locality
Naas, Kildare
County
Kildare
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Kildare County Council · reference 17.1007 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference17.1007

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0059123KE BCMS owner-supplied export

Two storey extension and single storey extension to rear (north west); internal alterations including new staircase; repairs and maintenance works to existing front facade; new granite front steps to replace existing steps and railings.

1 unit · 584 m² · stated on this notice

Planning reference 17.1007 Builder stated: James Breen Ltd
CN0041637KE BCMS open-data feed

Two storey extension and single storey extension to rear (North West), internal alterations including new centre staircase; repairs and maintenance works to existing front façade; new granite front steps to replace existing steps and railings to existing front entrance; replacement of existing PVC windows with new double glazed painted timber windows; roof works to existing roof; replacement of existing roof lights with new, no. 2 roof lights in new roof to north east, new raised external patio area to north east, sundry minor alteration works; decommissioning of existing septic tank and replacement with new tank and percolation area and all associated site works to an existing two storey detached house which is a protected structure

1 home · 696 m² · stated on this notice

Planning reference 17/1007

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.