Site start

Commercial site start — Mullingar

Mullingar, Westmeath

1 commencement notice · start date 07 May 2020 · planning reference given

Planning 196318 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
07 May 2020
Latest notice
371 m²
Planning reference
196318
Location
Unit 27, Lough Sheever Corporate Park, Robinstown, Mullingar, Westmeath

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Mullingar, Westmeath
County
Westmeath

Addresses on the notices

  • Unit 27, Lough Sheever Corporate Park, Robinstown, Mullingar, Westmeath
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Westmeath County Council planning record Application details, status and decision record for 196318. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Alterations to existing elevations, with the addition of a first floor window to the north & south elevations of the front façade. Permission is also sought to remove existing roller shutter door to the north elevation at the rear façade and replace with a fire door. Permission is also sought to add a mezzanine first floor level (298.6 sq m) to the interior of the existing building, which will include male and female toilets, changing rooms and showers, a staff room, office and fire stairs and all associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 371 m².

Planning reference 196318

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.