Site start
Housing site start — Kilbarry
Waterford
4 commencement notices · latest start date 22 Apr 2024 · planning reference given
Planning 18734 · Planning application · Council file · external
- Commencement notices
- 4
- Latest start date
- 22 Apr 2024
- Latest notice
- 66 houses
- Planning reference
- 18734
- Location
- Waterford
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 18734 Waterford City and County Council · checked 2026-07-29T15:38:37+00:00
Planning 18734 — CONDITIONAL · Decision 2019-03-21 · Final grant 2019-04-29
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Waterford
- County
- Waterford
Addresses on the notices
- Kilbarry, Waterford
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Waterford City and County Council planning record Application details, status and decision record for 18734. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 66 houses including work to common areas and infrastructure relevant to these units in respect of the second schedule of the Building Regulations.
Floor area stated for this source: 7,402 m².
Apt Block 3 in Phase 3 - 8 no. apartments proposed as part of the 2-storey building consisting of 4 no. 2-bed and 4 no. 1-bed apartments in each block.
Floor area stated for this source: 588 m².
Apt Block 2 in Phase 3 - 8 no. apartments proposed as part of the 2-storey building consisting of 4 no. 2-bed and 4 no. 1-bed apartments in each block.
Floor area stated for this source: 588 m².
Apt Block 1 in Phase 3 - 8 no. apartments proposed as part of the 2-storey building consisting of 4 no. 2-bed and 4 no. 1-bed apartments in each block.
Floor area stated for this source: 588 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.