Commencement notice group
Housing commencement notices — Inishannon
Inishannon, Cork
2 unique commencement events · latest notified commencement 05 Jul 2018 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 05 Jul 2018
- Latest notice
- 5 houses
- Planning references supplied
- 14/04845
- Public location
- Inishannon, Cork
Public source geography
Site location
- Public site / locality
- Inishannon, Cork
- County
- Cork
Public site labels seen across the notices
- Innishannon, Cork
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Works to Complete the construction of dwelling 40-44 Ard Aoibhinn Innshannon, which previously commenced on 26/09/2007. Works re commencing from roof structure level onwards. Works under previous commencement notice include the foundations and the steel frame structure up to wall plate level. This application is to certify from wall plate onwards to completion.
Floor area stated for this source: 854 m².
Works to complete the construction of dwelling houses 45-47 Ard Aoibhinn, Innishannon, which were previously commenced on 26/09/2007. Works re commencing from roof structure level onwards. Works previously constructed include including foundations, steel frame and timber roof structure only. In relation to Part L of the building regulations, the ground floor slab will comply with Part L (2005) with the remainder of the buidings complying with current Part L building regulations.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.