Site start
Housing site start — Terenure
Terenure, Dublin
1 commencement notice · start date 28 Aug 2025 · planning reference given
Planning SD25B/0184W · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 28 Aug 2025
- Latest notice
- 345 m²
- Planning reference
- SD25B/0184W
- Location
- Terenure, Dublin
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: SD25B/0184W South Dublin County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Terenure, Dublin
- County
- Dublin
Addresses on the notices
- the south of the dwelling including all associated site works and services
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD25B/0184W. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A) The demolition of the attached garage to the south-east of the dwelling, B) The construction of a single-storey extension in place of the demolished garage, C) The removal of a timber shed, D) The construction of a single storey extension to the north-east of the dwelling, E) The construction of 2 no. dormer windows to the front elevation, and F) Raising the single-storey roof at the south of the dwelling including all associated site works and services.
Floor area stated for this source: 345 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.