Site start
Building extension site start — Rosses point
Rosses point, Sligo
1 commencement notice · start date 17 Dec 2024 · planning reference given
Planning 2460004 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 17 Dec 2024
- Latest notice
- Scale not stated
- Planning reference
- 2460004
- Location
- Rosses point, Sligo
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 2460004 Sligo County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Rosses point, Sligo
- County
- Sligo
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Sligo County Council planning record Application details, status and decision record for 2460004. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the demolition of an existing entrance porch to the front, a single storey lean-to conservatory to the west elevation, and single storey outbuildings to the rear. It also consists of alterations externally to the rear return height and roof, to existing windows to front and both sides and internally to the layout. The new construction consists of a single storey flat roof extension and external patio to the west elevation, a single storey extension to the entrance encompassing a porch and bay window and a single storey extension to the west end of the outhouse/stable. It also includes a glazed double height link to a new two storey extension to the east end of the outhouse/stable, new additional rooflights and windows to both the main house and stable and all associated site works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.