Site start
Site start — Dublin
Dublin 2, Dublin
1 commencement notice · start date 27 Feb 2019 · planning reference given
Planning 3971/18
- Commencement notices
- 1
- Latest start date
- 27 Feb 2019
- Latest notice
- 175 m²
- Planning reference
- 3971/18
- Location
- 4 Clarendon Market, Dublin 2
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
Addresses on the notices
- 4 Clarendon Market, Dublin 2
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the removal of the internal wall separating the 2no. ground floor units creating one unified ground floor space, and minor internal alterations including the upgrading of the accessible bathroom and the upgrading of an existing stair into a fire escape compliant stair. External works include the removal of existing external shutters and their replacement with new internal shutters and changes to the facade including new doors, new concertina windows at ground level, the upgrading of existing awnings and associated signage and graphics.
Floor area stated for this source: 175 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.