Site start

Housing site start — Rush

Rush, Dublin

1 commencement notice · start date 19 Apr 2021 · planning reference given

Planning F20B/0313 · Planning application

View full project timeline

Commencement notices
1
Latest start date
19 Apr 2021
Latest notice
1 house
Planning reference
F20B/0313
Location
Rush, Dublin

Location

Where the site is

Area
Rush, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The construction of a sloped roof porch extension with a floor area of 7m2 to the front of a two storey dwelling, and a single storey extension of 37mw to the rear, with all associated site works at 9 Hand Park, Quay Road, Rush, Co. Dublin.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 3 m².

Planning reference F20B/0313

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.