Site start
Site start — Tuam
Tuam, Galway
1 commencement notice · start date 09 Aug 2021 · planning reference given
Planning 19/920 · Council file · external
- Commencement notices
- 1
- Latest start date
- 09 Aug 2021
- Latest notice
- 3,843 m²
- Planning reference
- 19/920
- Location
- Tuam, Galway
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 1
- Open exact official planning record: 19/920 Galway County Council
Exact appeal 305813 · Grant permission with revised conditions · 2020-02-18 · Open official case
- Completion certificate recorded — source scope not stated Galway County Council · commencement notice Completion certificate · First observed in the official monthly source 2021-08 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Tuam, Galway
- County
- Galway
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Galway County Council planning record Application details, status and decision record for 19/920. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(1) A 2 storey courtyard building with adjoining service and day-care wings comprising 50 no. ensuite bedrooms, together with all ancillary facilities, including reception area, day-care and therapy spaces, sitting, activity rooms and dining areas, family accommodation and associated amenities, offices and administration areas, a production kitchen, service areas, delivery areas, storage, external oxygen storage tank, utility connections, plant areas and roof-mounted plant. (2) Vehicular circulation routes, including 43 no. car parking spaces along with associated vehicular set-down area, delivery yard and 12 no. cycle parking spaces. (3) Provision of communal and private open space, site landscaping, including a roof terrace garden, landscaped courtyards, all other associated site services, site infrastructure and site development works.
Floor area stated for this source: 3,843 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.