Commencement notice group

Building extension commencement notices — Ballymote

Ballymote, Sligo

1 unique commencement event · latest notified commencement 08 Jun 2018 · planning reference supplied

Unique commencement events
1
Latest notified commencement
08 Jun 2018
Latest notice
695 m²
Planning references supplied
16/297
Public location
Ballymote, Sligo

Planning-anchored public geography

Site identity and location

Canonical public locality
Ballymote, Sligo
County
Sligo

Notice location variants

  • the rear of the building, and a new entrance and extended day-area of 38m2 at the front of the building CN0039800SO
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0039800SO BCMS open-data feed

Works to Ballymote Community Nursing Unit will consist of the construction of two new single storey extensions, alterations to the existing unit, and associated site-works. The extensions will comprise a new bedroom block of 387m2 to provide ten additional bedrooms at the rear of the building, and a new entrance and extended day-area of 38m2 at the front of the building. External works comprise new foul and surface water drainage installations, including a pumping station, a new gas storage compound, road re-surfacing, and landscaping.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 695 m².

Planning reference 16/297

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.