Site start

Site start — Dublin

Dublin

4 commencement notices · latest start date 10 Mar 2025 · planning reference given

Planning 2851/21 · Planning application

View full project timeline

Commencement notices
4
Latest start date
10 Mar 2025
Latest notice
88 m²
Planning reference
2851/21
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of a single storey storage and bin store building.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 88 m².

Planning reference 2851/21
Notice 2 Seven-day notice

Construction of a single storey ESB Substation and Switch Room

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 22 m².

Planning reference 2851/21
Notice 3 Seven-day notice

The development will consist of the provision of 1 No. part 4 No. storey, 1000 No. pupil Post Primary School and 4 no. classroom Special Educational Needs Unit, with a gross floor area of c 11,632sq m, including a P.E Hall and General Purpose Hall and all ancillary teacher and pupil facilities.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 11,632 m².

Planning reference 2851/21
Notice 4 Seven-day notice

The development will consist of 1 No. 2 storey, 16 No. classroom primary school and 2 No. classroom Special Educational Needs Unit, a General Purpose Hall and all ancillary teacher and pupil facilities with a gross floor area of 3360sq m.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 3,360 m².

Planning reference 2851/21

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.