Site start
Site start — Dublin
Dublin
4 commencement notices · latest start date 10 Mar 2025 · planning reference given
Planning 2851/21 · Planning application
- Commencement notices
- 4
- Latest start date
- 10 Mar 2025
- Latest notice
- 88 m²
- Planning reference
- 2851/21
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a single storey storage and bin store building.
Floor area stated for this source: 88 m².
Construction of a single storey ESB Substation and Switch Room
Floor area stated for this source: 22 m².
The development will consist of the provision of 1 No. part 4 No. storey, 1000 No. pupil Post Primary School and 4 no. classroom Special Educational Needs Unit, with a gross floor area of c 11,632sq m, including a P.E Hall and General Purpose Hall and all ancillary teacher and pupil facilities.
Floor area stated for this source: 11,632 m².
The development will consist of 1 No. 2 storey, 16 No. classroom primary school and 2 No. classroom Special Educational Needs Unit, a General Purpose Hall and all ancillary teacher and pupil facilities with a gross floor area of 3360sq m.
Floor area stated for this source: 3,360 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.