Commencement notice group
Building extension commencement notices — Murroe
Murroe, Limerick
1 unique commencement event · latest notified commencement 19 Jul 2016 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 19 Jul 2016
- Latest notice
- Scale not stated
- Planning references supplied
- 15/602
- Public location
- Murroe, Limerick
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Murroe, Limerick
- County
- Limerick
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Internal and external refurbishment works to the chapel (954sq.m). External works comprising the replacement of the high level clerestory glazing with new slim profile metal double glazing on the north, south and west elevations; the removal of associated high level storm glazing; the reconfiguration of entrance doors, steps and ramp. Internal works comprising the reconfiguration of the sanctuary and side chapels, internal re-decoration works to the walls, ceilings and floors; the provision of a an underfloor heating system, upgraded cavity wall and roof insulation as part of energy upgrade works to the chapel; and all associated site development and excavation works above and below ground.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.