Site start
Housing site start — Rathnure
Rathnure, Wexford
1 commencement notice · start date 28 Aug 2026 · planning reference given
Planning 20251458 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 28 Aug 2026
- Latest notice
- 1 house
- Planning reference
- 20251458
- Location
- Rathnure, Wexford
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 20251458 Wexford County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Rathnure, Wexford
- County
- Wexford
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wexford County Council planning record Application details, status and decision record for 20251458. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
M2B Permission to construct a new housing development comprising 15 houses as follows: Two terraces with two no. 2 bedroom units and two no. 3 bedroom units in each terrace, a terrace of three no. 2 bedroom units, two no. semi-detached 3 bedroom units in one block and two no. semi-detached 2 bedroom units in one block, with new site entrance along with associated services, site works and ancillary works for provision of a public footpath to the village in accordance with the drawings submitted
Floor area stated for this source: 6,769 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.