Commencement notice group
Housing commencement notices — An Tóchar
An Tóchar, Wicklow
3 unique commencement events · latest notified commencement 15 Apr 2024 · planning reference supplied
- Unique commencement events
- 3
- Latest notified commencement
- 15 Apr 2024
- Latest notice
- 5 apartments
- Planning references supplied
- 20/1087
- Public location
- An Tóchar, Wicklow
Public source geography
Site location
- Public site / locality
- An Tóchar, Wicklow
- County
- Wicklow
Public site labels seen across the notices
- Togher More, Wicklow
- Roundwood, Wicklow
- Togher More, Roundwood, Co
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wicklow County Council planning record Application details, status and decision record for 20/1087. Official council planning portal Verified official link Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of Block A - two-storey mixed-use development consisting of 2No. retail units&5No. Apartments at Togher More, Roundwood, Co. Wicklow.
Floor area stated for this source: 963 m².
Overall development total stated in source: 10 houses.
The construction of 23No. residential units (1No. 2-bed, 18No. 3-bed, 4No. 4-bed) and all associated site works.
Floor area stated for this source: 2,549 m².
The construction of 5 no. residential units (3 no. two bedroom apartments, 2 no. one bedroom apartments) and 2 no. commercial units (125.95 sq m and 140.79 sq m) and all associated site works
Floor area stated for this source: 690 m².
Overall development total stated in source: 10 houses.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.