Site start
Building extension site start — Rathmines
Rathmines, Dublin
1 commencement notice · start date 05 Jan 2017 · planning reference given
Planning 2646/16
- Commencement notices
- 1
- Latest start date
- 05 Jan 2017
- Latest notice
- Scale not stated
- Planning reference
- 2646/16
- Location
- Rathmines, Dublin
Location
Where the site is
- Area
- Rathmines, Dublin
- County
- Dublin
Addresses on the notices
- garden level and an extension at first floor return level to the rear (above existing two storey extension)
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of a single storey kitchen extension to the rear at garden level and an extension at first floor return level to the rear (above existing two storey extension); internal modifications including a new WC and utility spaces at garden level, a new shower room at ground floor return level, new ensuite at first floor level, and a new bathroom at second floor return level; external modification including 1 no. new rooflight to the existing roof to the rear; to existing semi-detached 3-storey house.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.