Site start

Building extension site start — Kinsale

Kinsale, Cork

1 commencement notice · start date 18 Feb 2022 · planning reference given

Planning 21/6388 · Planning application

Commencement notices
1
Latest start date
18 Feb 2022
Latest notice
576 m²
Planning reference
21/06388
Location
Dunderrow, Kinsale, Cork

Location

Where the site is

Area
Kinsale, Cork
County
Cork

Addresses on the notices

  • Dunderrow, Kinsale, Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Phase 1 (NW Annex, Shell and Core only) of a two-phase development located at the north-west corner of the existing IE08 Pharmaceutical Manufacturing and Production Building consisting of; demolition of an existing external staircase, internal modifications to the existing IE08 production building and the construction of a new 5 storey extension (including mezzanine floor). The proposed extension will be a non-production administration and support infrastructure facility. It will include; • Rooms to accommodate electrical, IT and automation infrastructure to service the existing production building and the proposed extension. • New administration facilities including staff changing areas, WC facilities, canteen and office areas, New entrance lobby, stairs and lift. • Mechanical and electrical plant, including rooftop plant. • External works including revisions to the internal vehicle roadways and pedestrian access ways and all associated site development, drainage, landscaping and ancillary works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 576 m².

Planning reference 21/06388

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.