Commencement notice group

Housing commencement notices — Rathgar

Rathgar, Dublin

1 unique commencement event · latest notified commencement 01 Nov 2016 · planning basis not stated

Unique commencement events
1
Latest notified commencement
01 Nov 2016
Latest notice
26 m²
Planning references supplied
None stated
Public location
Rathgar, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Rathgar, Dublin
County
Dublin

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Works to a semi- detached house (protected structure) comprising the modification of the design of the basement level, the re-instatement of an internal stair, the replacement of existing PVC windows/ doors to the sides of the house with suitable timber units, the removal of 1 no. window and 1 no. door in the rear basement façade to form a larger glazed opening; the re- instatement of a sash window in the rear upper ground floor façade to replace later French doors; the alteration of 1 no. window in the rear basement return façade; the construction of a 26m2 single storey rear extension; the re-organisation of the upper ground floor shower room to a guest wc and hallway; external landscape and site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 26 m².

Builder stated: Furlong Construction

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.