Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 06 Mar 2023 · planning reference given
Planning WEB1543/22 · Planning application
- Commencement notices
- 1
- Latest start date
- 06 Mar 2023
- Latest notice
- 123 m²
- Planning reference
- WEB1543/22
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Two story hipped roof extension to side and rear along with a flat roof extension to the rear of the existing building. Removal of existing log cabin and green house with new 39.5m2 single story flat roof ancillary garden studio along rear garden boundary.
Floor area stated for this source: 123 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.