Site start

Housing site start — Dublin

Dublin

2 commencement notices · latest start date 22 Jul 2026 · planning reference given

Planning FW25A/0418E · Planning application

View full project timeline

Commencement notices
2
Latest start date
22 Jul 2026
Latest notice
6 units
Planning reference
FW25A/0418E
Location
Dublin

Reviewed planning, commencement and document evidence

View the dossier catalogue

Exact reviewed project dossier for FW25A/0418E under Fingal County Council, retaining 1 separate commencement identities.

Commencement identities
1
retained separately
Latest group date
2026-03-13
not assigned across events
Maximum on one notice
Not stated
never summed
Reviewed index
7
1 exact document links

Planning and appeal references

Every retained commencement event

  • 2026-03-13 Commencement notice Official public source URL unavailable in the reviewed projection

Exact organisation roles

  • Fingal County CouncilPlanningauthority · Authority retained with the exact reviewed planning identity.

Explicit facts with official citations

Each statement keeps its exact reference, official title or drawing-title locator, and review state.

  • Architecture The exact official file index lists "H4A Elevations & Section". FW25A/0418E · H4A Elevations & Section · H4A Elevations & Section · reviewedexacttitle Open official evidence
  • Architecture The exact official file index lists "H4A Plan". FW25A/0418E · H4A Plan · H4A Plan · reviewedexacttitle Open official evidence
  • Otherdrawing The exact official file index lists "Proposed Site Layout Sheet 2 of 2". FW25A/0418E · Proposed Site Layout Sheet 2 of 2 · Proposed Site Layout Sheet 2 of 2 · reviewedexacttitle Open official evidence
  • Otherdrawing The exact official file index lists "Proposed Site Layout Sheet 1 of 2". FW25A/0418E · Proposed Site Layout Sheet 1 of 2 · Proposed Site Layout Sheet 1 of 2 · reviewedexacttitle Open official evidence
  • Phasing The exact official file index lists "Luttrellstown Gate Phase 2 Site A Energy Statement". FW25A/0418E · Luttrellstown Gate Phase 2 Site A Energy Statement · Luttrellstown Gate Phase 2 Site A Energy Statement · reviewedexacttitle Open official evidence
  • Engineeringanddrainage The exact official file index lists "Road Markings & Signage & Surfacing.". FW25A/0418E · Road Markings & Signage & Surfacing. · Road Markings & Signage & Surfacing. · reviewedexacttitle Open official evidence
  • Engineeringanddrainage The exact official file index lists "Roads Layout & Levels.". FW25A/0418E · Roads Layout & Levels. · Roads Layout & Levels. · reviewedexacttitle Open official evidence

Official document index highlights

Reviewed exact official destinations and explicit index titles; this is not asserted to be the complete authority file.

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Fingal County Council planning record Application details, status and decision record for FW25A/0418E. Fingal County Council Official link · last checked 29 Jul 2026 Reviewed exact authority-local planning record for this full planning reference.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of a three-storey residential block (Block K) forming part of the Luttrellstown development, as described in planning permission FW25A/0418E and all associated site works.

Work stated for this notice 6 units Explicit phase quantity stated by the source.

Floor area stated for this source: 388 m².

Planning reference FW25A/0418E Developer stated: Castlethorn Developments Luttrellstown Ltd.
Notice 2 Commencement notice (owner-supplied)

Construction of 50no. units and associated stie works as described in planning permission reg FW25A/0418E

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 5,686 m².

Source unit value with scope not stated: 50 units. It is not presented as notice-specific scale.

Planning reference FW25A/0418E Developer stated: Castlethorn Developments Luttrellstown Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.