Site start
Building extension site start — Maynooth
Maynooth, Kildare
1 commencement notice · start date 01 Sep 2025 · planning reference given
Planning 2461311 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 01 Sep 2025
- Latest notice
- Scale not stated
- Planning reference
- 24/61311
- Location
- Maynooth, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 24/61311 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Maynooth, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 24/61311. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of; 1) The removal of roofs at ground floor level, 2) A new porch to the front elevation, 3) Widen the existing driveway entrance, 4) New side extension at first floor level to accommodate a new bedroom and bathroom, 5) New rear extension, part two storey, to accommodate; a kitchen and family space, and bedroom on first floor. This new extension roof to have rooflights, 6) An attic conversion to accommodate new living space. 7) A change to the main existing hipped roof to an apex / gable roof. The roof to have a new dormer window and skylights to the rear elevation. New gable to have additional windows, 8) All alterations, internal modifications and all associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.