Commencement notice group

Commercial commencement notices — Naas

Naas, Kildare

2 separate notices · latest notified commencement 30 Aug 2021 · planning reference supplied

Source notices
2
Latest notified commencement
30 Aug 2021
Latest notice
233 m²
Planning references supplied
PL09.JA0041
Public location
Naas, Kildare

Public source geography

Site location

Public site / locality
Naas, Kildare
County
Kildare

Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Appeal referencePL09.JA0041

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0080836KE BCMS owner-supplied export

Remediation of Kerdiffstown landfill to include the construction of a third building - Changing Rooms. The single storey construction will comprise 4 No. Changing Rooms, various Storage Rooms, Boiler Room, Office and public toilet facilities for disabled, female and male users. An external water and oil tank storage compound will be located to the rear of the building.

233 m² · stated on this notice

Appeal reference PL09.JA0041 Builder stated: Wills Bros. Ltd
CN0074669KE BCMS open-data feed

Remediation of Kerdiffstown Landfill Site to include the construction of two administrative buildings - Office and Leachate Management Building and the latter addition of a prefabricated conference room unit. Office Building is a single storey building consisting of 2 No. offices, a kitchen, lobby and bathroom facilities. The Leachate Management Building is a double volume building with an internal single storey element consisting of a laboratory and Mechanical Control Room with a precast concrete slab roof. The double volume element is taken up by a Plant Room.

134 m² · stated on this notice

Appeal reference PL09.JA0041

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.