Site start
Commercial site start — Naas
Naas, Kildare
2 commencement notices · latest start date 30 Aug 2021 · planning reference given
Planning PL09.JA0041
- Commencement notices
- 2
- Latest start date
- 30 Aug 2021
- Latest notice
- 233 m²
- Planning reference
- PL09.JA0041
- Location
- Tipper Road, Naas, Kildare
Location
Where the site is
- Area
- Naas, Kildare
- County
- Kildare
Addresses on the notices
- Tipper Road, Naas, Kildare
- Unnamed Road, Naas, Kildare
- Notice source points are up to 276 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.241651, -6.631634 Open point
- Public notice source · 53.239165, -6.631590 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Remediation of Kerdiffstown landfill to include the construction of a third building - Changing Rooms. The single storey construction will comprise 4 No. Changing Rooms, various Storage Rooms, Boiler Room, Office and public toilet facilities for disabled, female and male users. An external water and oil tank storage compound will be located to the rear of the building.
Floor area stated for this source: 233 m².
Remediation of Kerdiffstown Landfill Site to include the construction of two administrative buildings - Office and Leachate Management Building and the latter addition of a prefabricated conference room unit. Office Building is a single storey building consisting of 2 No. offices, a kitchen, lobby and bathroom facilities. The Leachate Management Building is a double volume building with an internal single storey element consisting of a laboratory and Mechanical Control Room with a precast concrete slab roof. The double volume element is taken up by a Plant Room.
Floor area stated for this source: 134 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.