Commencement notice group

Housing commencement notices — Knocknarea

Knocknarea, Sligo

1 separate notice · latest notified commencement 06 Jul 2016 · planning reference supplied

Source notices
1
Latest notified commencement
06 Jul 2016
Latest notice
Scale not stated
Planning references supplied
15119
Public location
Knocknarea, Sligo

Public source geography

Site location

Public site / locality
Knocknarea, Sligo
County
Sligo

Public site labels seen across the notices

  • Primrose Grange House which is a protected structure (rps no

No usable public source coordinate is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference15119

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0017970SO BCMS owner-supplied export

Development consisting of the upgrading of an existing proprietary wastewater treatment system and installation of a new polishing filter at Primrose Grange House which is a protected structure (rps no. 222) at Grange East Td, Knocknarea, Co. Sligo

Scale not stated on this notice

Planning reference 15119 Builder stated: Arken Construction

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.