Site start
Housing site start — Lucan
Lucan, Dublin
3 commencement notices · latest start date 03 Mar 2023 · planning references given
Planning SD22A/0105 SD19A/0042; ABP Ref. 305948-19
- Commencement notices
- 3
- Latest start date
- 03 Mar 2023
- Latest notice
- 92 m²
- Planning references
- SD19A/0042 · SD22A/0105 · 305948
- Location
- Lucan, Dublin
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 1
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: SD22A/0105 South Dublin County Council · checked 2026-07-30T12:30:00+01:00
Planning SD22A/0105 — GRANT PERMISSION · Decision 2022-06-08 · Final grant 2022-07-19
Amendment or variation of · SD22A/0105 → SD19A/0042
SD22A/0105 is recorded as amendment or variation of SD19A/0042.
South Dublin County Council · checked 2026-07-30T12:30:00+01:00Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Lucan, Dublin
- County
- Dublin
Addresses on the notices
- R120, Lucan, South Dublin
- R120, Lucan, Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD22A/0105. South Dublin County Council Official link · last checked 30 Jul 2026 Exact official source shared from the planning and approval record.Open amendment or variation file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
CCB 04 & 05, Switchroom modules - These modules are purposed to house the MV switchgear. MV cables will enter the switchgear from the grid transformers and leave the switchgear to supply the datacentre buildings. Access will be needed for operation, inspection and maintenance purposes at R120, Lucan, South Dublin
Floor area stated for this source: 92 m².
CCB 01 & 02, Switchroom modules — These modules are purposed to house the MV switchgear. MV cables will enter the switchgear from the grid transformers and leave the switchgear to supply the data centre buildings. Access will be needed for operation, inspection and maintenance purposes at R120, Lucan, South Dublin
Floor area stated for this source: 92 m².
CCB 03, Control room — This module is purposed to house the equipment and panels which control and protect the MV switchgear and transformers. The house supply AC & DC distribution boards are also located in this building. Control cabling will be routed from this module to each of the switchrooms and transformers via underground ducts. Access will be needed for operation, inspection and maintenance purposes at R120, Lucan, Co. Dublin
Floor area stated for this source: 46 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.